Mills Lane Storm Drain

The work generally consists of, and should be priced separately as follows: Storm Drain Improvements: approximately 45’ of 36” storm pipe, 894’ of 48” storm pipe and 3,867’ of 60” storm pipe running under Mills Lane. Mills Lane Improvements: Mills Lane re-alignment, highway 29 intersection work and railroad crossing. La Fata Sidewalk Improvements: Sidewalk improvements at the west side of La Fata. Recycled Water Improvements: Convey recycled water line in the public right of way in Mills Lane extending from Highway 29 easterly to the eastern end of Mills Lane and connect to existing line.

Status

Bidding Closed

Prebid Date 3/16/22 2:00pm
Bid Date 4/18/22 2:00pm

Company & Contacts

City of St. Helena
Ben Snead  
bens@centricgc.com

Location

City of St. Helena

The General Contractor (GC) will have a MANDATORY PRE-BID MEETING for this project. Pre-bid meeting will be on location at Mills Lane, St. Helena, CA, on 3/16/2022 at 2pm

Bids shall be uploaded electronically to the BPXpress plan room via the “Submit Bid Docs” tab on the Mills Lane Storm Drain Project web page before 2:00 p.m. Friday, April 4, 2022.
Guidelines for BPX Online Plan room Sealed Proposal Submission are available online at BPXplanroom.com. Proposals will be timestamped by the website upon receipt and placed in a secure location by BPXpress to be accessed only by a representative from Centric General Contractors.
Bids will be publicly opened via an online meeting at 3 p.m. on April 4, 2022 at the link below: Please check the link prior to bid opening meeting (if planning on attending) and email bens@centricgc.com if issues arise.
Google Meet joining info
Video call link: https://meet.google.com/wof-zrqr-zwb
Or dial: (US) +1 617-675-4444 PIN: 765 819 593 7023#
More phone numbers: https://tel.meet/wof-zrqr-zwb?pin=7658195937023